Case Histories

API Multi-Stage Centrifugal Pump, Drop-In Replacement

Installed in 1978, the unspared 10-stage axial split pump suffered chronic seal failures every 5–6 months and required full refurbishments every 18 months. Rising maintenance costs and lost production forced the refinery to seek a permanent solution.

Industry / Sector: Petroleum Refining
Locations: USA
Client: Confidential